Capacity Determination

Date Ref. No. Title Related Links
19/04/2024
PNGRB/Tech/10-CapNGPL/(2)/2014 (E-2798) Declaration of Capacity of GAIL's CJHPL Network
19/04/2024
PNGRB/Tech/10-CapNGPL/(6)/2015 (E-2802) Declaration of Capacity of GAIL's KG Basin Network
19/04/2024
PNGRB/Tech/10-CapNGPL-GAIL's Integrated/(1)/2023 (E-4233) Declaration of Capacity of GAIL's Integrated/Interconnected Pipeline network
12/04/2024
PNGRB/Tech/10-CapNGPL-GSPL/(3)/2022 (E-3797) Declaration of Capacity of GSPL's HP Gas Grid Natural Gas Pipeline